Tunneling Construction Techniques I
Bauverfahren des Tunnelbaus I
Last Updated: 2026-02-05 15:29:25
Abstract
Transfer of detailled knowledge of tunneling methods for excavation in hard rock as a core competence of the Swiss construction industrie.
Objective
Advanced knowledge of tunneling techniques as well as professional skill to apply the construction methods under various project specific boundery conditions.
Content
History and relevance of tunneling: - Rock classification - Excavation- and supporting methods Excavation methods: - Drill and blast excavation - Road header excavation - TBM excavation Logistic: - Back-up systems - Mucking and transport systems - Ventilation - Site installation Supporting methods: - Shotcrete - Rock bolts and steel arches - Face supporting measures, pipe umbrellas Lining methods: - Concrete lining - Tubbings Cycle time analysis for optimization of the overall process
Resources
Lecture Notes
siehe Literatur
Literature
Girmscheid, G.: Baubetrieb und Bauverfahren im Tunnelbau, Ernst & Sohn, Berlin, 2000 (enthält aktuelle Literaturliste)
General Information
- Language
- German
- Levels
- MSC
- Frequency
- Yearly recurring
Examination
- Type
- session examination
- Mode
- oral 30 minutes
Course Components
| Type | Title | Time & Place | Hours |
|---|---|---|---|
| lecture with exercise | Bauverfahren im Tunnelbau I (Fels) |
|
2 h weekly |