VVZ API is not affiliated with ETH Zurich. Data might be outdated or incorrect. Please view the official ETHZ Vorlesungsverzeichnis for binding information.
Engineering Tool: Planning of Human Work
Ingenieur-Tool: Planung menschlicher Arbeit
Last Updated: 2026-02-05 16:22:30
Abstract
This course gives an introduction into the planning and optimization of human work procedures in industry as a basis for the determination of personnel requirements. By using Methods of Time Management (MTM) it is shown, how work procedures are modelled in the different abstracted layers.MTM is the benchmark for time in process elements - an international standard.
Objective
The participants learn the basics in planning and optimizing of human work. They recognize that the problem solving based on work-organisation (e.g. efficiency of the staff members, pulsing) and ergonomical issues (e.g. overload of staff members) is made easier to achieve through the planning with MTM.
Content
This educational-objective will be shown by machine demonstrations, movies and lecture/theory. The contents will be engrossed in practice oriented group works. 1. The input by MTM to solve operational tasks - definition and application of MTM (process elements) - 7 wastes - comparison MTM, stopwatch, estimation - planning of working-systems (personnel requirements and optimized operational procedures) 2. The MTM-System and the respective main attributes - system elements - information content of MTM-application flow diagram - simulations ability 3. Development of processes - description of shortage, flow, rhythm, layout, standards, complexity, amount of parts etc. - is (analysis) - should-be (synthesis) in CHF 4. Application of MTM for the entire process chain - 3-stage model: development, scheduling, operation in fabrication and assembly - assembly fitting production engineering in the development, structuring appendage - work in the rated range, transparency and staff member motivation - ergonomically assessment of the working area, norm for human effort 5. MTM-systems and border lines (compression) - differences in the application MTM 1, MEK, UAS - IT-support: Ticon, Prokon - classification REFA, IE, stopwatch, ROM; Value Stream, KAIZEN, KVP, 5S, Lean Management etc. - other applications for logistic, administration, hospital etc.
Resources
Lecture Notes
- Script: Copies of the foils will be distributed to the participants- downloadable movies from real examples as extension- MTM-Time card with 5S and the 7 wastes
General Information
- Language
- German
- Levels
- BSC
- Frequency
- Yearly recurring
Examination
- Type
- ungraded semester performance
Registration & Places
- Max Places
- 24
- Signup End
- 20.02.2023
Course Components
| Type | Title | Time & Place | Hours |
|---|---|---|---|
| colloquium |
Ingenieur-Tool: Planung menschlicher Arbeit
Blockkurs in der ersten Semesterwoche.
Ort: Gruppenraum des Technoparks ZH
|
|
12 h semesterly |
Offered In
-
-
-
6. Semester Engineering Tools (The Engineering Tools courses are for MAVT Bachelor’s degree students only.)
-
-