VVZ API is not affiliated with ETH Zurich. Data might be outdated or incorrect. Please view the official ETHZ Vorlesungsverzeichnis for binding information.
Construction Methods
Bauverfahren
Last Updated: 2026-02-05 15:42:19
Abstract
- Construction methods of Special Underground and Deep Foundation Construction as well as tunnelling methods- Planning of construction processes, site equipment and site logistics- Basic knowledge of scheduling and cost calculation and introduction in corresponding standards and guidelines
Objective
Students gain practical knowledge in - Organization of tender documents. - Scheduling and cost calculation. - Construction methods of Special Underground and Deep Foundation Construction as well as tunnelling methods. - Planning of earthwork processes and conception of site logistics.
Content
Basics: - SIA 103, SIA 112, SIA 118 - Cost calculation - Scheduling - Submission (detailed estimate, special provisions, acceptance standards) - Methods of ground investigation and ground control Special Underground / Deep Foundation Construction: - Dewatering systems - Pipe jacking/ Micro tunnelling - Piles / Retaining walls - Anchors - Soil improvements - Cut-and-cover method - Caissons - Supporting construction methods: soil injection/ jetting Tunnel construction: - Classification of tunnelling - Conventional drive tunnelling - Mechanical drive tunnelling - Drainage and Sealing - Lining/ finishing - Supporting construction methods: pipe umbrellas Execution of contruction work und logistics: - Planning of production processes - Logistics/ site equipment - Transportation logistics - Formwork and cranes
Resources
Lecture Notes
Slides, supplementary handouts about selected topicsThe documents will be provided on Ilias - further information at the beginning of semester.
Literature
References to additional technical literature will be provided in the course of semester.
General Information
- Language
- German
- Levels
- BSC
- Frequency
- Yearly recurring
Examination
- Type
- session examination
- Mode
- written 120 minutes
- Aids
- Leistungsermittlungshandbuch für Baumaschinen und Bauprozesse oder Handout mit Auszügen des Handbuchs; Taschenrechner ohne externe Kommunikationsmöglichkeiten
Course Components
| Type | Title | Time & Place | Hours |
|---|---|---|---|
| lecture with exercise | Bauverfahren |
|
4 h weekly |